Tutt Bryant Equipment
DETAILS
When —
Where —
Services —
Work carried out included:
N.E.R fitted along with N.E.R monitoring relay with inbuilt earth leakage capability.
Fit larger motor cables with a 241.1 mining flex.
Fit individual Earth Leakage relay/Toroid and Shunt to each individual motor starter.
All motor starter feeds disconnected and removed and fitted with double insulated wire feeds.
Existing transformer disconnected and removed and a new earth shielded isolation transformer fitted and wired.
Replaced the plugs and receptacles with metal de-contactor fittings.