Tutt Bryant Equipment

DETAILS
When —
Where —
Services —

 

Work carried out included: 

  • N.E.R fitted along with N.E.R monitoring relay with inbuilt earth leakage capability. 

  • Fit larger motor cables with a 241.1 mining flex. 

  • Fit individual Earth Leakage relay/Toroid and Shunt to each individual motor starter. 

  • All motor starter feeds disconnected and removed and fitted with double insulated wire feeds. 

  • Existing transformer disconnected and removed and a new earth shielded isolation transformer fitted and wired. 

  • Replaced the plugs and receptacles with metal de-contactor fittings.

Previous
Previous

Milbrae Business Group